Usable floor area
The usable floor area of a dwelling is: ‘The total usable internal floor area of the dwelling as measured by the surveyor, rounded to the nearest square metre. A new modelling approach adopted since the 2013 report uses assumptions aligned with the Nationally Described Space Standard which was published as part of the Housing Standards Review. It excludes integral garages, balconies, stores accessed from the outside only and the area under external walls. The area remaining represents the total of all room areas, hallways and circulation space including cupboards and stairs. The area under internal partition walls is also included. Loft space is not included unless the loft is habitable, with a fixed stair in place to access it. Dwellings are also grouped into the following five categories:
- Less than 50m2.
- 50 to 69m2.
- 70 to 89m2.
- 90 to 109m2.
- 110m2 or more.’
Ref English Housing Survey, Energy efficiency, 2018-19, published by the Ministry of Housing, Communities & Local Government in July 2020.
See also: Total usable floor area.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.























